Strength testing, tightness testing, purging, commissioning and decommissioning of commercial gas installations under IGEM/UP/1 and IGEM/UP/1A.

Testing and purging is the part of commercial gas work where most installations are won or lost. A new installation cannot be put into service until it has been strength tested (where required), tightness tested and purged, and an existing installation cannot be safely worked on or decommissioned without the same discipline.

These guides explain how the procedures in IGEM/UP/1 and IGEM/UP/1A work in practice: how installation volume is calculated, how test pressures and durations are chosen, when direct purging is acceptable and when nitrogen is needed, and what records should be produced at the end.

Guides in this section